See The Light

Sept. 28, 2010

Provided By: Ingersoll Rand, Mocksville, NC

When the sun sets, the most important tool on some job sites becomes a light tower. Without a source of light, work can't continue, especially during those times of the year when daylight is shorter and deadlines are looming. Light towers are reliable and have a compact design, performing their duty without taking up a lot of space on the job. However, if not properly maintained, a light tower might stop working, turning off the lights and shutting down work on nighttime jobs.

Provided By: Ingersoll Rand, Mocksville, NC

When the sun sets, the most important tool on some job sites becomes a light tower. Without a source of light, work can't continue, especially during those times of the year when daylight is shorter and deadlines are looming. Light towers are reliable and have a compact design, performing their duty without taking up a lot of space on the job. However, if not properly maintained, a light tower might stop working, turning off the lights and shutting down work on nighttime jobs.

Fortunately, light towers don't require a lot of work to keep running. However, Fred Pickett and Jack Wright, generator field service technicians with Ingersoll Rand, say that contractors should still familiarize themselves with the machines and take precautions to keep their light towers running properly.

Pickett starts with some practical advice. "Before operating the light tower, contractors should read the operator's manual," he says. "Be familiar with the operator's manual first. Usually, it's the last thing contractors look at." The operator's manual will highlight safe operating and maintenance procedures. Knowing what to look for will mean less downtime when a problem occurs.

Maintenance Checks

There are three things contractors should check on light towers at the start of every work day: air filter, oil level and coolant level. Inspect the air filter before starting the engine. Remove the air filter and knock any dust out of it. Before starting the engine, check the oil and coolant levels. Checking the oil on a light tower is similar to checking the oil in a car — remove the dipstick, wipe it off, replace it, and then remove it again to see where the oil level is. Coolant containers are clear, so checking the coolant level requires only a visual check to make sure there is enough coolant in the container.

The most basic maintenance is for oil and air filters. Ingersoll Rand LightSource light towers use Kubota engines, which recommend that the oil be changed every 200 hours. Air filters should be changed every 500 hours. These recommendations will change based on the environment where the light tower is being used.

While light towers are used in special event applications, such as concerts or sporting events, the equipment is most often found on dusty construction sites. The dirt in the air takes a toll on light towers, and contractors need to make sure they are changing the oil and the air filter as required when working in these conditions. "A dirty air filter on a diesel engine is going to make the engine lose horsepower because it can't get any air. As soon as the light tower is in a dirty environment, the air filter will last only 100 to 200 hours," says Wright. When working in dirty environments, Pickett and Wright recommend that the air filter is changed with the oil.

Before starting the machine, Pickett recommends walking around the light tower to make sure there are no loose items on the engine, generator or the mast, and that wire connections to the light fixtures are tight. "The light towers have plug-in wire connections that should be checked before starting the machine," says Pickett.

Other checks to perform before starting the light tower include making sure the fuel tank has not been damaged, testing all belts for proper tensioning and inspecting the battery and connections are in place.

Pickett also says that contractors should take care of the decals on the machine on a monthly basis, to make sure they have not become damaged or illegible. "Make sure the decals are intact. They contain important safety and operational information that operators need to know," says Pickett.

Light tower cabling should be checked every month. When a cable has become frayed or damaged, it needs to be replaced.

Whenever maintenance is performed, there is a right way to go about it. "Never perform maintenance with the engine running," says Pickett.

The battery requires special attention when performing maintenance. "If changing parts, the battery should be disconnected, so there is no possibility of the engine starting," says Pickett. "If working on the battery, wear protective clothing and eye protection."

Wright recommends that contractors keep track of their tools, especially when working with the battery. Never lay a tool on the battery when working on the machine. "Leaving tools on the battery is an unsafe practice because the amps that get drawn on the battery when shorted by a misplaced tool can be hazardous," says Wright.

Tools should always be kept off the machine. It's easy to forget where a tool has been placed, and any tool left on top of the engine, radiator or generator could fall into the machine when started and cause major damage.

Towing The Light Tower

Before towing the machine, Wright suggests doing a quick inspection of the light tower to make sure it is in condition to be transported. "Check the lug nuts on the wheels to make sure they are tight," says Wright. The undercarriage should be inspected to make sure there is nothing broken, and that nothing is under the machine that might damage it. Harness wiring should not be damaged.

"Use the proper size hitch and be sure to use the safety chains," says Wright. "Don't exceed the speed limit rating on the machine. The instructions show how to put the safety chains on and show the recommended speed." The maximum speed an Ingersoll Rand light tower can be towed is 65 miles per hour.

Never tow the machine with the mast extended, even if it is just to a different location on the job site. The machine is not designed to be transported with the mast extended, and doing so may cause damage.

Start Up And Shut Down

Properly starting the machine is another key to keeping the light tower running correctly. "Before starting the machine, make sure all the breakers, switches and lights are turned off," says Pickett. "If the light switches and the breakers are on, the machine is starting under a load." Starting under a load is rough on an engine, and decreases engine life.

The same goes for shutting down the light tower. Turn off all lights, switches and breakers before turning the engine off. Wright encourages contractors to let the engine run and cool down for two or three minutes after the lights and breakers are off.

Raising and Lowering the Mast

There are three things Wright says contractors should remember when it comes to raising the mast: using the outriggers, keeping the machine level and being aware of wind speed. "The outriggers should be fully extended and locked, and the machine should be level before raising and lowering the mast," says Wright.

Most light towers have a bubble level on an enclosure near the mast to help contractors make sure the machine is level. All light towers have a wind rating — Ingersoll Rand models can be used in winds up to 65 miles per hour. Usually the light tower will not be used in high winds, but any time a contractor suspects that winds are near 65 miles an hour, the mast should be lowered as a precaution.

Changing Light Bulbs

The need to change light bulbs will not occur as often as oil or air filters. Under optimum conditions, high-pressure sodium bulbs have a lifespan of 24,000 hours, metal halide bulbs will last 12,000 hours and tungsten bulbs have a life of 2,000 hours.

These lights are very hot and should not be changed when the engine is running. Shut the machine down and give the bulbs proper time to cool. "Use gloves to remove the old light bulb and to screw the new bulb in," says Pickett.

Use Clean Fuel

Most contractors don't think about fuel as a way to keep their machines running properly. Pickett says that using clean fuel keeps the engine running with better efficiency. "The best maintenance a contractor can do with light towers is to regularly change the filters when they need to be changed, and to use new, clean fuel," says Pickett.

Fuel that has been sitting in a tank for a long period of time may collect dirt or water. The longer fuel sits in a tank, the lower the rating on the fuel will be.

Running Other Components From a Light Tower

Pickett says that contractors need to allow their light tower to do what the machine is designed to do — provide light. If contractors need to power other components, getting a generator on-site should be considered.

"Use only OSHA-approved, three-pronged plugs in the receptacles," says Pickett. Make sure the cord on the component that is plugged into the receptacle is not damaged, and never put any stripped or bare wires into the receptacle.

Pickett has also seen contractors try to use the light tower to power a jobsite trailer, a function the machine is not designed to perform. "The LightSource has a 6-kilowatt generator. When the four lights are running, they consume 4.4 kilowatts. That leaves 1.6 kilowatts to use for auxiliary equipment," says Pickett. "Most contractors don't realize that 6 kilowatts are not available when the lights are running and end up overloading the machine." Instead, use a generator to power other equipment.

Storing The Light Tower

When it comes time to store the machine for an extended period, such as over the winter, the mast should be lowered and locked in place. Wright says that the coolant is the most important thing to check on the machine. "Add diesel fuel conditioner to the fuel and make sure the coolant can protect the engine," says Wright. "Test the coolant. A machine with weak coolant will freeze the engine block over the winter."

When new light towers leave the factory, they have a 50-50 solution of anti-freeze and water. This mix will protect the engine down to minus 34 degrees Fahrenheit. However, osmosis and any leaks that may have occurred sometimes cause contractors to add more water to the machine. This is why the coolant should be inspected, to make sure there is enough of a balance to keep the water from freezing. Wright also suggests that any ground wire be removed from the battery when storing the machine for the winter.

Not a lot of work is required to keep a light tower maintained. By regularly performing required maintenance, and by operating the machine safely and in a fashion recommended by the manufacturer, Pickett says contractors can expect a long life from their light tower. "If maintained properly, 22,000 to 24,000 hours on a light tower is possible," says Pickett. "I've seen some machines get into the 30,000-hour range." A well-maintained machine will keep the lights running and keep the work continuing through the night.